Method Statement for Fan Coil Unit (FCU) Installation in HVAC Systems
👋Welcome to the Insight Control System Blog Page🌟
Proper installation of a Fan Coil Unit (FCU) is essential for the long-term efficiency, performance, and safety of any HVAC system.
Whether you’re working on a commercial building, residential project, or industrial facility, this detailed method statement ensures your installation meets industry best practices, complies with safety standards, and delivers optimal energy efficiency.
Let’s break down the process step-by-step so you can achieve professional results every time.
Basic of Fan Coil Unit (FCU)
What is a Fan Coil Unit?
A Fan Coil Unit is a simple air handling device found in many HVAC systems.
It's designed to heat or cool a specific space by circulating air over a coil filled with hot or chilled water.
Basic Components of an FCU:
- Fan (Blower): Circulates air into the room,
- Coil: Transfers heat or coolness to the air (using hot/cold water)❄️,
- Filter: Removes dust and particles from the air,
- Drain Pan: Collects and drains condensate water,
- Casing: The housing that holds all components,
- Control Valve and Thermostat: Regulates temperature and operation,
![]() |
Basic Components of an FCU |
SCOPE AND PURPOSE🔽
This Method Statement covers the onsite installation of FAN COIL UNIT'S (FCU) and the requirements of checks to be carried out.
Fan Coil Units generally be installed in locations shown in drawings, serving apartments mechanical rooms etc., both yin concealed areas and exposed supplying cold dehumidified air conditioned space.
Reference Documents📜
- Project Specifications,
- Approved shop drawings (latest revision),
- Approved material submittals,
Equipment🛠️
Responsible Personnel👷♂️
METHOD OF PRE INSTALLATION:
- Ensure that approved material required to carry out work will be available,
- Prior to commencement of work, area and access will be inspected to confirm that the site is ready to commence the work,
- All relevant documentation and material applicable to particular section of works will be checked by site engineer before commencement,
- Physical verification of material will be carried out for any damages prior to taking from stores,
- The site engineer or supervisor will give necessary instruction to tradesman and provide necessary construction and shop drawings,
- The site engineer and supervisor will also check that tools and equipment’s available are in compliance to contract requirements,
- The site supervisor also explains tradesman regarding safety precautions to be observed.
![]() |
METHOD OF PRE INSTALLATION |
METHOD OF INSTALLATION🔧
- Prior to commencement of work coordinate ion will be done with other services.
- Determine the position of Fan Coil Unit on the ceiling and mark the location of supports as per approved shop drawing.
![]() |
Fan Coil Unit supports |
- Prepare and fix the Fan Coil Unit supports as per approved construction drawing and specification.
- Ensure that Vibration Isolators of approved make, type and model are installed.
- Install the Fan Coil Units by lifting it slowly by using suitable lifting aids (if necessary).
- Manufacturer's recommendations shall be followed during installation.
- Any cut edges of angles, channels or threaded rods will be touch up with Zinc rich paint.
- Fan Coil Units will be connected with Piping Connections complete with valves and accessories as indicated in approved shop drawing.
- Ensure that Dielectric unions are used for piping connection to FCU's.
![]() |
piping connection |
- FCU Valve packages shall be provided with drain pan as shown in approved shop drawing.
- Ensure that drain connections are made with adequate slope with running trap.
- Complete the duct connections to Fan Coil Units as shown in approved shop drawing.
- Complete the Electrical power connection includes earthing a all respects as per approved electrical drawing and Manufacturer's recommendations.
- Ensure that adequate space for maintenance of fan coil units and valve package is available.
- Install the thermostat control units as per shop drawing/ Architectural PE/SS/FM drawing.
- Complete the BMS (building management system) interfacing with DDC (direct digital controller) controllers as per approved BMS drawings.✏️
📎 Related: Method Statement for HVAC Fan Installation Floor & Ceiling Mounted Systems Step-by-Step Guide
Quality Control📝
OCE along with Project Engineer and site Supervisor will monitor that all components are installed as per the contract specifications and approved submittals.
Inspection Request (IR) shall be submitted to the Main Contractor/Consultant.
![]() |
Inspection Request |
Safety⛑️
- Work will commence as per safety regulations laid down in the contract specification and project safety plan.
- Proper safety harness to be used and secured, if required.
- All personal protective equipment shall be used as appropriate according to the nature of job.
- Housekeeping shall be of good standard and all cut lengths and debris shall be removed.
![]() |
safety regulations |
Conclusion🎯
Installing a Fan Coil Unit the right way can drastically improve HVAC performance, energy savings, and system longevity. By following this method statement, you ensure accurate installation, smooth operation, and minimal maintenance issues.
Stay tuned for more HVAC installation guides and smart building solutions that can take your projects to the next level. 💡
📎 Related: How to Calculate Humidity and Temperature in a Humidification Plant Using Hygrometers
Thank you for visiting🙏📺 WATCH HVAC SYSTEMS VIDEOS PLAYLIST
Comments